Total Buildable Area
1.8 million sq.ft (approx)
Levels
Ground + 3 parking levels + Podium + 12 habitable floors
Structure & Finishes
Advance high-end lobbies meticulously designed to give you a sensorial impact
Typical Floor Plate
Extensive floor plates upto 48,000 sq.ft with 80% efficiency
Floor To Floor Height
Wide column spans with a height clearance of 3.6 meters,finished floor to ceiling
Total Number Of Proposed Buildings
3 buildings, each of approx. 5.5 L sq.ft of BUA and an incubation centre of 1.15 L sq.ft
Typical Column Grid
8.5 x 10.5 metres
Cladding & Elevation Treatment
6 mm double glazed units (DGU) facade designed to allow maximum daylight,
curtailing the temperature, thus reducing the operational cost
Toilet Bays
Fully finished toilet bays
on each floor
Floor Trunking
Bare finished slab with floor cushioning of
about 55–65 mm
Floor Efficiency
80%
Power Back-Up
100% automated DG back-up for lighting, power & air conditioning
Power Capacity
Connected electrical load of 1 kva per 100 sq.ft of carpet area.
Car & Two-Wheeler Parking
1 car park per 850 sq.ft & 2 two-wheeler parking
per 1000 sq.ft of leased area.
Service Provider
MSEB
Vehicular Parking
3 Parking Levels.
Floor Loading Capacity
Typical areas floor loading 500 kg/sq.mt
(Including live load, finished Load, etc.)
Critical Areas:
a) Loading for UPS/Electrical areas
-1200 kg/sq.mt
b) Loading for AHU area
-700 kg/sq.mt
c) Loading for server
-1200 kg/sq.mt
List Of Proposed Common Amenities
Recreational spaces, food court, futsal courts, convenience stores, medical services, ATMs and fitness & yoga centre.
Environment
A scenic hill view with a pollution free environment
Bus Parking
Bus bay parking for convenience
Advance Technology
Optical fibre connectivity
Wi-Fi
High-speed Wi-Fi connectivity in work spaces
Elevators
High-speed passenger & service elevators in each tower
Analogue Addressable
Fire
Alarm System
Smoke detectors have been considered in all
the lift lobbies, electrical rooms, all enclosed
areas, etc
Public Address
System
Speakers have been considered in all the
parking, utility and common areas
CCTV
The cameras have been provided
at the main
entry and exit points, entrance to each floor,
complete periphery premises and parking
area
Access Control
System
All the utility rooms will have the access control system.
This would enable the facility manager
to track the movement of the facility team
Manned Security Desk
Security system with 24 hours CCTV surveillance and 100% access control
Fire Protection /
Fire Systems
Intelligent fire alarm system
Fire Hydrant Tank
Underground storage tank and
overhead tank
NFPA Compliance
The building has a structure designed to seismic zone specs &
structurally NFPA complaint
Fire Sprinklers
Advanced fire detection and suppression systems with fire & smoke detectors
and sprinklers