Building The Favorite IT
Destination Of Pune

Developed to provide the best of engineering, construction and design

Development Details

img1

Total Buildable Area
1.8 million sq.ft approx.


img1

Levels
Basement + 3 Podium (PARKING) + Ground + above 12 floors IT offices


img2

Structure & Finishes
The building design & construction is based as per relevant I.S. codes


img2

Typical Floor Plate
Vast and efficient floor plates up to 50,000 sq.ft


img2

Floor To Floor Height
4.0 meter (CC)


img1

Total Number Of Proposed Buildings
3 buildings, each of approx. 5.7 L sq.ft of BUA and an incubation centre of 1.15 L sq.ft


img1

Typical Column Grid
8.5 m X 10.5 m


img9

Cladding & Elevation Treatment
Double glass façade units, external 6 mm thick + Heat strengthened curtain wall glazing

img1

Toilet Bays
Fully finished toilet bays on each floor


img1

Floor Trunking
Bare finished slab with floor cushioning of about 55–65 mm


img2

Floor Efficiency
80%


img1

Power Back-Up
100% Generator Back-up


img1

Power Capacity
Connected electrical load of 1.25 kva per 100 sq.ft of carpet area


img2

Car & Two-Wheeler Parking
1 car park per 800 sq.ft & 2 two-wheeler parking per 1000 sq.ft of the leased area


img1

Service Provider
MSEB


img9

Vehicular Parking
Parking levels with staggered basement 4 levels, individual basement for each tower


img9

Floor Loading Capacity
Typical areas floor loading 500 kg/sq.mt (Including live load, finished Load, etc.)
Critical Areas:
a) Loading for UPS/Electrical areas
-1200 kg/sq.mt
b) Loading for AHU area
-700 kg/sq.mt
c) Loading for server
-1200 kg/sq.mt


img18

List Of Proposed Common Amenities
Food court, Recreational area, Convenience store, Medical store, Fitness centre, Yoga centre, Daycare centre & ATM’s

Security System For Common Areas

Analogue Addressable Fire
Alarm System

Smoke detectors have been considered in all the lift lobbies, electrical rooms, all enclosed areas, etc.


Public Address System
Speakers have been considered in all the parking, utility and common areas


CCTV
The cameras have been provided
at the main entry and exit points, entrance to each floor, complete periphery premises and parking
area


Access Control System
All the utility rooms will have the access control system. This would enable the facility manager to track the movement of the facility team


Manned Security Desk
A separate security station. CCTV monitors for cameras in the building and monitoring for BMS


Fire Protection / Fire Systems
As per NBC norms


Fire Hydrant Tank
Underground storage tank and overhead tank


NFPA Compliance
The building has a structure designed to seismic zone specs & structurally NFPA complaint


Fire Sprinklers
As per the government norms, all floors will have compulsory sprinklers which will be provided by the developer

Floor Plans

Project Timelines:

Incubation Centre: Sep 2019
Tower A: March 2020

Master Plan